Skip to the log
Kept at the worksNotes checked before stamping

The day's log

The Kiln Log

Notes from the cement works, kept at the log

Shift over

grinding

The mill

grinding: ball mills, roller presses, separators and fineness

Noted in this section

4

October 20261 note

  1. Vertical roller coal mill and classifier housing beside a cement plant main burner platform, with inerting gas piping visible

    grindingThe mill

    The mill that feeds the flame

    Before a cement kiln burns coal, a separate mill has to grind and dry it to a fine, flammable dust. A note on the coal mill, its explosion risk, and why that circuit is the one the plant watches hardest.

    5 min

August 20261 note

July 20261 note

  1. Electric motor room of a cement grinding plant with large motors and cable trays feeding the mills

    grindingThe mill

    Where the power goes

    Grinding is the hungriest step in cement making. A note on comminution efficiency, the ball mill's limits, and why roller presses and vertical mills took the load.

    5 min

April 20261 note

  1. Laboratory air permeability fineness test apparatus and a 45 micron sieve beside a cement sample jar

    grindingThe mill

    Fineness is a promise

    Blaine, sieve residue and particle size distribution: a note on what cement fineness numbers mean, what the separator does, and what overgrinding costs.

    5 min